Samuel Beckett Bridge, Dublin

The Samuel Beckett Bridge was constructed in 2006/2007, Ideal Form was awarded the Formwork and Rebar packages as well as providing the crawler crane hire required onsite. The project began with the constructionof reinforced concrete abutments on each quay wall and a support pier in the River Liffey. 

A large sheet piled cofferdam was constructed to enable the pier to be built. The cable stayed bridge is unique in Ireland as it can rotate through 90 degrees to allow the navigation of marine traffic on the River Liffey.

CRANE HIRE

Crawler cranes deliver excellent mobility over soft surfaces

FORMWORK

Over thirty years experience in shuttering and formwork

CRANE Specs

Specification, Lifting & Duty Charts

GET IN TOUCH

Over thirty years experience in shuttering and formwork

Get in touch

Shopping Basket